Accessible water
Equipment follows the depth, water condition and material. The contractor should explain which rooms and reachable surfaces are included in the agreed removal scope.
A tool crossing the visible floor cannot establish the condition of every hidden layer. Ask how the edge of the wet area will be checked and recorded.

